Updated COVID-19 GuidelinesLearn More
Conducted a comprehensive facade inspection report. Prepared design documents to address roof repairs that were identified during the building envelope survey. Performed weekly site visits and on-site progress meetings during the construction administration phase for the stair replacement and roof maintenance projects. Sullivan Engineerings continues to perform periodic leak investigations.
Year Built
1968
Height
3 Stories
Plan Dimensions
150 Acre Campus
Usage
Commercial
![]() |
Location: 777 Old Saw Mill River Road |
![]() |
Project Type: Building Envelope Survey, Roof Repairs, Construction Administration, Leak Investigation, Stair Replacement |
![]() |
Building Owner: Regeneron Pharmaceuticals Inc |
![]() |
Managing Agent: Old Saw Mill Holdings, LLC c/o Jones Lang LaSalle, As Agent |